Skip to content

Estimate required

Demolition

Clearing the way

Interior strip-outs, structure removal, and hauling away what is left behind.

The KOM DifferenceQuality workHonest pricingLicensed and insured
  • Demolition

    Interior and structural demolition, carried out safely and cleanly.

    Consultation firstFree 15-minute video review, or $149 on site

  • Trash Removal

    Clear and haul away debris, old fixtures, and site waste.

    Consultation firstFree 15-minute video review, or $149 on site

Choose how you would like to get started

Book an on-site consultation

Select the demolition service you need and choose your preferred date. Michael will call to discuss the job and confirm your appointment.

$149 on-site consultation

If you hire us for the work, we apply the full $149 to your final invoice.

Start with a free video call

Send photos of the demolition work. We will review them with you during a free 15-minute video call and explain possible next steps.

Free 15-minute video call

This is an initial review, not a project estimate. Kitchen and bathroom projects require an on-site visit before we can provide reliable pricing.

Request a free video call

Ask us a question

Not sure which service you need? Send us the details, and we will help you choose the right next step.

Send your question

Or call us on 248-270-7165.

Why choose KOM USA

Licensed and insured

Both, on every job. It is worth asking any contractor to show you — including us.

Metro Detroit only

Wayne, Oakland and Macomb. Local enough that turning up matters to us.

Honest pricing

Where a job can be priced up front, it is — set before we arrive, not after. Where it genuinely depends on what we find, we quote once we have seen the work, because a number given any earlier is a guess.

One team for both trades

Maintenance and construction under one roof, so the people who build it are the people you call afterwards.

Common demolition questions

What does a demolition job include?

Our demolition work can include interior strip-outs, structure removal, and hauling away the resulting debris. The exact scope depends on what needs to come out and what needs to stay. We inspect the job first and quote the work based on that scope.

Do you take away the debris?

Yes. Hauling away demolition debris is part of the job. We also offer trash removal when you need unwanted material removed without a larger demolition project. We price the work after seeing what needs to be removed.

Does demolition need a permit?

Some demolition work requires a permit, especially structural removal or larger projects. Requirements depend on the type of work and the municipality where the property is located. Permit needs should be confirmed before work starts rather than assumed from the size of the job.

What about asbestos or lead paint in an older house?

We do not remove asbestos or perform lead abatement. If either material may be present, we stop and determine whether testing or a qualified specialist is required before demolition begins. Disturbing these materials can release hazardous fibers or dust.

How long does an interior demolition take?

It depends on the area being demolished, what must be removed, access to the site, and what must remain. An interior demolition project in a property under about 1,500 square feet may take roughly 1 week. Larger or more complex projects take longer.

Can you demolish part of a room and leave the rest?

Yes, selective demolition can remove specific finishes, fixtures, walls, or other parts of a space while leaving surrounding areas in place. We need to see what is being removed and what must remain before quoting the job, especially when structural components or utilities are nearby.

How do you protect the rest of the house during demolition?

It depends on the scope. For a kitchen demolition, we cover the flooring along the route to the dumpster, seal the room entrance with a zippered dust barrier, and use a negative-air machine to exhaust dust outside. These measures help keep dust from spreading through the house.

What do I need to do before demolition day?

Remove personal belongings and anything you want to keep from the work area. For a kitchen, this includes plates, silverware, food, and everything inside the cupboards. If you prefer, we can clear the area for an additional fee.

KOM Members

Free to join. Nothing to cancel.

Sign up and every job you book sits in one place, with your properties saved so you are not retyping an address each time.

Sign up free

You can still book without one.

CallFree Video Call